Friday, March 25, 2011

The front "conservation" Velux is now installed.  The builders now enter the loft by climbing over the top of the roof and going through the dormers.

Plastering has started.

The cistern is mounted.

The wall is reinforced to allow me to mount a TV on it.

A good impression of the available head height...

The left hand chimney...

The "snug". What shall I do with this space? 

Front Velux...  Note the ventilation tile. The insulation is so tight the air gap has to be ventilated.

 Lead covering of the dormer, nearly done. That chimney still needs fixing.

 The hole where the chimney was has now been tiled.
 The top of the dormer has a layer of insulation between the lead and the wooden structure, which also has insulation between the wood beams. The thickness of the dormer roof indicates how much insulation this place has!

Velux roof light to the left, should give a nice view of the aerials.

Closing up for the weekend.